An Industrial Revolution

The machine shop side of the workshop is complete. Ducting has been run and the sub-panels in. I won’t go into too many of the details as it was more of a hassle than anything else. Numerous trips to home depot, rona, lowes, to purchase all manner of ducting, fittings, screws, hose clamps tape, in various diameters, gauges and orientations. But it’s in and I have enough parts left over to build a small space station. Nasa, look me up if you’re reading this.

IMG_1185.JPG
IMG_1275.JPG
IMG_1273.JPG

Progress Slowly

If all goes well the shop should be up and running in a couple weeks. An electrician will be by to install a 100amp sub-panel tomorrow, which leaves me with the dust collection ducting to figure out. Haven’t quite decided on whether to use 24g stove pipe single wall duct or to go with sewer piping. The sewer piping is difficult to find around these parts, it seems 6” diameter is only sold wholesale to the plumbing trades…

I’ve landed on machine placement, the layout below seems to have the best feng-shui, however these things tend to change in practice.

Once complete it’ll be time to start prepping stock for the roubo build.

Screen Shot 2019-01-27 at 1.50.40 PM.png
IMG_0839.JPG